Latest News

padma bridge paragraph for job preparation

Niyogbd June 10, 2021

Padma bridge length, Padma bridge update, Padma bridge cost, Padma bridge latest news, Padma bridge span number, Padma bridge design, Padma setu length, Padma bridge composition, পদ্মা সেতু কত কিলোমিটার, পদ্মা সেতুর দৈর্ঘ্য, পদ্মা সেতুর কাজ, পদ্মা সেতুর বাজেট, পদ্মা সেতুর বর্তমান অবস্থা, পদ্মা সেতুর সর্বশেষ খবর, podda setu nirman

 

Padma bridge

 

Padma Bridge is a multi-purpose road and railway bridge under construction on the Padma River in Bangladesh. Through this, Shariatpur and Madaripur will be connected with Munshiganj's Lohajang. The bridge will connect the south-western part of the country with the north-eastern part through this bridge. Padma Bridge For a developing country like Bangladesh, the Padma Bridge is one of the most challenging construction projects in history. The two-tiered steel and concrete truss bridge have a four-lane road at the top and a single rail at the bottom. The country's largest bridge has been constructed in the Padma-Brahmaputra-Meghna river basin with 41 spans of 150 meters length and a length of 6.15 kilometers and a width of 16.10 meters. The total land required and acquired for this is 916 hectares.

 

Padma bridge paragraph

 

 

 

Related Post